Skip to content
Märkische Projekt Bau
Märkische Projekt Bau
Märkische Projekt Bau

Knowledge & Topics

Blog

Detached house exterior
6 min read

ILB Funding Brandenburg 2026: 10,000 Euro Grant Plus Interest-Free Loan for Home Ownership

Anyone building or buying in Brandenburg can get a 10,000 euro grant and an interest-free loan of up to 230,000 euros through the ILB. What the 2026-2028 guideline offers and how to combine it with KfW.

FundingNew Build
Modern energy-efficient residential house in daylight, photo
6 min read

Efficiency House 40: Requirements, Funding and What It Means for Construction

Efficiency House 40 uses only 40 percent of the primary energy of a reference building. What the standard requires and why it unlocks KfW new-build funding.

FundingNew Build
Classic older building with a brick facade and divided-light windows, photo
6 min read

Jung kauft Alt (KfW 308): Buying and Renovating an Older Home to EH 85

The KfW 308 “Jung kauft Alt” programme funds buying and renovating an older home with a low-interest loan. From 3 August 2026 the loan amounts rise to as much as €180,000.

FundingRenovation
Modernised interior after energy renovation, photo
5 min read

BAFA Funding 2026: Insulation and Windows at 20 % With an iSFP

BAFA funds insulation, windows and exterior doors with a 15 % grant. The individual renovation roadmap raises the rate to 20 % and doubles the eligible-cost cap to €60,000.

FundingRenovation
Documents and financial planning on a desk
6 min read

Tax Credit under Section 35c or a Grant: When the 20 Percent Tax Reduction Pays Off More

The tax credit under Section 35c of the German Income Tax Act deducts 20 percent of your renovation costs straight from your tax bill, up to 40,000 euros over three years. When it beats a BAFA grant and where the either-or line runs.

FundingRenovation
Building plans and planning documents on a table, photo
6 min read

Building permit in Brandenburg: documents, process and processing time

Which documents the building authority needs, how the path runs from preliminary design to approval, and what clients should arrange in parallel for site access and utility connections.

Building permitApproval
Construction site of a turnkey hall with cranes, photo
6 min read

Turnkey construction in Brandenburg: the process phase by phase

From the first meeting through building permit, shell and interior fit-out to handover: how a turnkey project runs with a general contractor, shown with the hall built for BERTH Werbung in Gallun.

Turnkey constructionConstruction process
New timber roof truss under construction, carpentry work on a building site
6 min read

Adding a Storey and Attic Conversions in Berlin and Brandenburg: Living Space from the Existing Building

Adding a storey or converting the attic creates living space without buying new land. What the structure allows, which construction method fits, and when BEG funding applies.

Roof ExtensionAttic Conversion
Modern commercial hall interior, photo
7 min read

Building a Commercial Hall: The Factors That Really Drive Cost and Schedule

Whether a commercial hall goes up in 10 months or drags on much longer is decided before the first shovel hits the ground. These factors set cost and construction time in industrial hall construction.

Hall ConstructionIndustrial Construction